Zalba, V. and Toncovich, A.A. (2023) “A bi-objective metaheuristic for the problem of sequencing repetitive jobs in a flowshop heijunka production setting”, AACINI - International Journal of Industrial Engineering, (1), pp. 5–20. Available at: https://riii.fi.mdp.edu.ar/index.php/AACINI-RIII/article/view/73 (Accessed: 21 September 2026).